Parks and Recreation Minutes - Parks Board Meeting Minutes - June 23, 2026

MinutesMeeting date is not supplied. The date shown is the publication date.

Read the original record for the complete wording and any vote details.

Summary

The Parks & Recreation Board approved the June 3, 2026 minutes and received a preliminary presentation on the proposed Medal of Honor Boulevard roadway, sidewalk, landscaping, wayfinding, lighting and utility improvements. No binding vote on the project was taken; the designs remain preliminary and will return to City Council with re-rendered concepts and updated costs within one month.

AI-generated summary. Verify details with the original document.

Key decisions

  • Approved the June 3, 2026 Parks Board meeting minutes (unanimous).
  • Received preliminary design concepts for Medal of Honor Boulevard; no final design or location decision made.
  • Members expressed support for parking on the north side with a 10-foot trail and 7-foot landscape parkway to maximize green space and pedestrian connectivity.
  • Native Texas and drought-tolerant plants, cedar elm trees with root barriers, and bio-swales/rain gardens were emphasized for stormwater and low maintenance.
  • Traditional historic-style benches and downtown-consistent materials (reclaimed brick, stamped concrete, pavers) were favored.
  • Project will be re-presented to City Council within one month; targeted construction is spring 2027 (about 10 months from initiation).

How this affects you

  • Street layout changes could alter parking and traffic patterns along Medal of Honor Boulevard in the downtown area.
  • Wider pedestrian trails, crosswalks and curb extensions are intended to improve walking safety and connect parks, the high school and the museum.
  • Underground utility lines would improve appearance and safety but could cost at least $120 per foot, possibly over $200,000 per section, with Oncor designing utilities at no initial cost to the city.
  • Residents are encouraged to provide input; additional public outreach opportunities are expected.

Important deadlines

  • July 23, 2026: Approximate deadline for re-rendered concepts and updated costs to be presented to City Council (within one month of June 23, 2026 meeting).
  • Spring 2027: Targeted construction start, approximately 10 months from project initiation.

Locations mentioned

  • Medal of Honor Boulevard
  • Culberson Street (Medal of Honor to California)
  • California Street
  • Downtown Gainesville pedestrian promenade
  • Gainesville Civic Center (meeting location)

Topics

  • roads
  • parks
  • downtown
  • utilities
  • development
  • environment
  • public-safety

Vote results

  • Approval of June 3, 2026 Parks Board minutesunanimouspassed

Financial details

Estimated cost of underground utility lines
$120+ per foot
Estimated cost for some underground utility sections due to transformers and utility coordination
Possibly exceeding $200,000
Document information
Type
Minutes
Published
Sept. 18, 2026
Source
Parks and Recreation Minutes
Document text

PARKS & RECREATION BOARD-CITY OF GAINESVILLE MEETING MINUTES The Parks & Recreation board met for a monthly meeting on June 23rd, 2026 at 5:30 p.m. at the Gainesville Civic Center. Members Present: Paula Moore, Dick Haayen, Mary Jo Dollar, Matt Compton, Latecia Hendricks, Angel Gonzalez, Joanie Jones. Members Absent: Staff Present: Kevin Gann, Zenia Cruz, Allen McDonald, Barry Sullivan, Tommy Moore Guests Present: Colton, John, and Amanda ACTION A quorum was present. Frist Item was to approve of June 3rd, 2026 minutes. Latecia Hendricks made the motion and Mary Jo Dollar second the motion. Passed with unanimous consent. DISCUSSION Project Presentation: Medal of Honor Boulevard Colton and team members John and Amanda provided an overview of the proposed improvements for Metal of Honor Boulevard. The presentation included discussion on street design, sidewalks, landscaping, pedestrian and wayfinding infrastructure, and water management components. Members were encouraged to ask questions and provide feedback throughout the presentation. It was emphasized that the designs were preliminary and subject to refinement based on input. Several street configuration options were discussed including: Four-lane divided street, Narrower Street with parking on one or both sides, parking types considered: Parallel, angled, or none on certain sides, the preferred option includes parking on the north side with a 10-foot trail and a 7-foot parkway for landscaping and trees. Members expressed support for parking on the north side to maximize green space and pedestrian connectivity. Crosswalk options and curb extensions were also discussed for pedestrian safety. Material options included concrete, stamped concrete, and paver: reclaiming bricks are considered for aesthetic consistency with downtown and farmer's market, costs, the use of accents and banding in stamped concrete or pavers was suggested to enhance visual appeal. Landscaping and stormwater: Native Texas plants and drought-tolerant species are emphasized for low maintenance, Trees such as cedar elms are recommended, with root barriers to prevent sidewalk damage, Bio-swales and rain gardens are proposed to manage stormwater effectively, with options for infiltration and filtration depending on budget. Traditional, historic-style benches are preferred, benches will be placed along the promenade and near monuments, custom options, including laser-cut logos, are available for branding and aesthetic enhancement. Sign options range from simple directional sign to more detailed maps with icons, Signs preferred from members includes signage will connect key destinations and used for both pedestrians and vehicular navigation, and panels can be undated with changeable inserts for new information. Lighting will meet foot- candle standards and not antique lighting. Banners and string lights for events are considered. Underground utility lines are highly desirable for aesthetics and safety, estimated cost: at least $120 per foot, possibly exceeding $200,000 for sections due to transformers and coordination with utility companies, Utilities will be designed by Oncor at no initial cost to the city, with ongoing maintenance responsibility transferred away from the city. The project builds on planning efforts dating back, including water/wastewater master plans, stormwater management, and Gainesville's guiding documents. The project is driven by infrastructure needs (stormwater line improvements, sewer rehabilitation, street connectivity) and aligns with downtown promenade goals. Recent street reconstructions are integrated into the project scope. The plan extends other streets from recent reconstruction to improve connectivity. The project supports the broader downtown promenade, liking parks, the high school, museum, and other key destinations. Re-rendered concepts and updated costs will be presented to the City Council within one month. Final design and location decisions will follow. Construction is targeted for spring next year, approximately 10 months from project initiation. Members are encouraged to continue providing input. The project scope will be refined based on feedback, and additional opportunities for public outreach will be incorporated. ADJOURN The meeting adjourned at 7:06 p.m. Respectfully submitted, June 23rd, 2026 Zenia Cruz Administrative Assistant Parks and Recreation Department Paula Moore Vice Chair Date [Slide content, pages 4–12 (Medal of Honor Boulevard presentation, 6/23/2026):] 1. Medal of Honor Boulevard – Roadway & Landscaping Enhancement Concepts – A through review prepared for the Parks & Recreation Board – June 2026 – Kimley»Horn – Gainesville 2. Agenda: Project Information; Street and Sidewalk; Landscape; Pedestrian and Wayfinding; Illumination; Q&A 3. Project Information – Planning Efforts: Street and Utility Maintenance Program (SUMP); Water/Wastewater Masterplans; Guiding Gainesville 2040 – Comprehensive Plan, Downtown Master Plan, Parks & Trails Master Plan 4. Planning Efforts – Other Project Components: Storm Drain, Sewer Line, Water Line, Culberson Street – Medal of Honor to California 5. Planning Efforts – Guiding Gainesville 2040 Goals: 3.A – Protect and Showcase Historic Character; 4.A – Establish and Activate the Downtown Cultural District; 4.C – Modernize Infrastructure; 5.A – Optimize Parking Management and Visibility; 5.B – Cultivate a Multimodal Network; 5.C – Invest in a Downtown Pedestrian Promenade 6. Project Information – 5.C – Invest in a Downtown Pedestrian Promenade (map; Primary Route, Secondary Route) 7. Street and Sidewalks – Option 1: Standard section, parking on both sides. Option 2: No south side parking, wider south side trail. Option 3: No south side parking, wider median. (4.C – Modernize Infrastructure; 5.A – Optimize Parking Management and Visibility; 5.B – Cultivate a Multimodal Network) 8. Street and Sidewalks – Paving Options: Concrete Pavement; Stamped Concrete Pavement; Street Pavers; Curb Extensions 9. Landscape – Native Texas Landscaping: Tree Options (Texas Redbud, Desert Willow, Texas Mountain Laurel, Yaupon Holly, Cedar Elm, Red oak – resilient tree tradition); Shrubs & Perennials Options (Texas Sage, Texas Skullcap, Wax Myrtle, Purple Coneflower, Blackfoot Daisy & native grasses, Gulf Coast Muhly Grass); Locally Sourced Materials: Reclaimed Brick Pavers, Integral Colored Concrete, Stamped Concrete, Texas Limestone or Austin Chalk Limestone, Lueders Stone or Sandstone 10. Landscape – Concept A (Legend: 1. Median Enhancements, 2. Shade Trees, 3. Rain Garden/Bioswale, 4. Bioswales/Trench Drains, 5. Brick Pavers, 6. Gravel, 7. River Rock, 8. Bollards, 9. Accessible Bench Seating, 10. Planting Beds, 11. Existing Trees) 11. Landscape – Concept A Enlargements (Rain Garden; Monument Enhancement) 12. Landscape – Concept B (Legend: 1. Median Enhancements, 2. Shade Trees, 3. Rain Garden/Bioswale, 4. Flagstone, 5. Gravel, 6. River Rock, 7. Accessible Bench Seating, 8. Planting Beds, 9. Existing Trees) 13. Landscape – Concept B Enlargements (Legend: 1. Median Enhancements, 2. Shade Trees, 3. Rain Garden/Bioswale, 4. Flagstone, 5. Gravel, 6. River Rock, 7. Bench Seating, 8. Planting Beds; Rain Garden; Monument Enhancement) 14. Pedestrian and Wayfinding – Existing Bench Types 15. Pedestrian and Wayfinding – Traditional Bench Options 16. Pedestrian and Wayfinding – Modern Bench Options 17. Pedestrian and Wayfinding – Modern Bench Options 18. Pedestrian and Wayfinding – Wayfinding Sign Options 19. Pedestrian and Wayfinding – Wayfinding Map Style Options 20. Illumination – Allegra Medium Fixture; Cali Fixture; Acrylic Washington Postle Style Utility Fixture 21. Illumination – Acorn Medium Fixture: Summary Rhugo Medium, 6200K, CRI 70+, 6200 lm/nominal; Mounting Height 18ft; Pole Spacing 70ft; Distribution Type III. 3.A – Protect and Showcase Historic Character 22. Illumination – Summary CAL-L, 4200K, CRI 70+, 5130 lm/nominal; Mounting Height 18ft; Pole Spacing 70ft; Distribution Type III. 3.A – Protect and Showcase Historic Character 23. Illumination – Summary AXFD2, 3000K, CRI 70, 12000 lm/nominal; Mounting Height 14ft; Pole Spacing 70ft; Distribution Type III. 3.A – Protect and Showcase Historic Character 24. Illumination – Utility Undergrounding. 4.C – Modernize Infrastructure 25. Questions?