GvilleTX

Text size

Reading size

Ask GvilleTX

Gainesville and Cooke County

Roads

A map, a condition and a source for the trip ahead.

Chapter 1 of 3

Know the road before you go

Loading the road map

23 records on the map: 2 closed roads, 1 traffic incident, 4 roadworks, 16 TxDOT projects. 4 outside Cooke County are left off. Most recent record Oct 9, 6:00 PM. The map shows reported conditions, not live traffic speed. Sources: TxDOT, TomTom, NWS. Map data © Mapbox © OpenStreetMap.

Chapter 2 of 3

Closures and works

  • Closed road1S Wine St closed from Truelove St to E Tennie StSince Sun., Oct. 4, 12:59 PMAbout 750 feet
    Report details

    What the source says: Closed. From Truelove St to E Tennie St.

    Source: TomTom traffic report. Read Oct 9, 6:00 PM.

  • Closed road2S Wine St closed from E Tennie St to E Garnett StSince Fri., Oct. 2, 6:37 PMAbout 400 feet
    Report details

    What the source says: Closed. From E Tennie St to E Garnett St.

    Source: TomTom traffic report. Read Oct 9, 6:00 PM.

  • Traffic incident3I-35 southbound slow traffic from Exit 485 to Exit 475BSince Fri., Oct. 9, 3:13 PM
    Report details

    What the source says: Slow traffic. From CR-248/Exit 485 (I-35) to Rector Rd/Exit 475B (I-35).

    Source: TomTom traffic report. Read Oct 9, 6:00 PM.

  • Roadworks4I-35 northbound roadworks from Exit 501 to the frontage roadPlanned through Dec. 1, 2028
    Report details

    What the source says: Roadworks. New roadworks layout. From FM-1202/Prime Outlet Blvd/Exit 501 (I-35) to Frontage Rd (I-35).

    Source: TomTom traffic report. Read Oct 9, 6:00 PM.

  • Roadworks5FM-1306 roadworks between the I-35 frontage road and FM-51Both directions, planned through June 11, 2027
    Report details

    What the source says: Roadworks. From I-35 Frontage (FM-1306) to FM-51 (FM-1306). Roadworks. From FM-51 (FM-1306) to I-35 Frontage (FM-1306).

    Source: TomTom traffic report. Read Oct 9, 6:00 PM.

  • Roadworks6FM-1306 roadworks from the I-35 frontage road to FM-51Planned through June 11, 2027
    Report details

    What the source says: Roadworks. From I-35 Frontage (FM-1306) to FM-51 (FM-1306).

    Source: TomTom traffic report. Read Oct 9, 6:00 PM.

  • Roadworks7I-35 roadworks between the frontage road and the Oklahoma lineBoth directions, planned through Dec. 1, 2028
    Report details

    What the source says: Roadworks. From Frontage Rd (I-35) to TX--OK State Border (I-35). Roadworks. New roadworks layout. From TX--OK State Border (I-35) to Frontage Rd (I-35).

    Source: TomTom traffic report. Read Oct 9, 6:00 PM.

  • TxDOT projectI-35 widening at the Red River BridgeAdds lanes. 52% built. Estimate $20.7M
    Report details

    What the source says: Widen Freeway: Widen Road - Add Lanes: from ON IH 35 AT THE RED RIVER BRIDGE to .: (est. $20.7M)

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectI-35 widening, 0.2 mile south of US 82 to Red River BridgeAdds lanes. Estimate $320.8M
    Report details

    What the source says: Widen Freeway: Widen Road - Add Lanes: from 0.2 MILES SOUTH OF US 82 to RED RIVER BRIDGE: (est. $320.8M)

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectCR 156 bridge replacement near CR 490Bridge replacement
    Report details

    What the source says: Bridge Replacement: from CR 490/SIGN CR 156 to at Draw

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectCR 218 bridge replacement near CR 302Bridge replacement
    Report details

    What the source says: Bridge Replacement: from CR302/Sign Cr 207 at Spring Creek to .

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectCR 342 bridge replacement near CR 258Bridge replacement. 96% built
    Report details

    What the source says: Bridge Replacement: from CR258/Sign CR 341 at Draw to .

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectFM 373 drainage work, Biffers Lane to CR 485Adds shoulders
    Report details

    What the source says: Culvert & Storm Drainage Work: Widen Road - Add Shoulders: from Biffers Lane to CR 485

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectFM 373 widening, Dry Elm Creek to CR 485Adds shoulders. Estimate $7.3M
    Report details

    What the source says: Widen Non-Freeway: Widen Road - Add Shoulders: from Dry Elm Creek to CR 485: (est. $7.3M)

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectFM 1306 seal coat, FM 51 to I-35Resurfacing
    Report details

    What the source says: Seal Coat: from FM 51 to IH 35

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectFM 1306 sidewalks, FM 51 to Gainesville High SchoolSidewalks and curb ramps. 31% built. Estimate $1.1M
    Report details

    What the source says: Pedestrian, Sidewalks & Curb Ramps : Construct Pedestrian Infrastructure: from FM 51 to Gainesville High School: (est. $1.1M)

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectFM 3442 seal coat, FM 3002 to Denton County lineResurfacing
    Report details

    What the source says: Seal Coat: from FM 3002 to Denton CL

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectFM 3496 seal coat, FM 372 to FM 902Resurfacing
    Report details

    What the source says: Seal Coat: from FM 372 to FM 902

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectFM 372 safety work, 0.25 mile west of CR 294 to FM 3496Hazard removal. 25% built. Estimate $2.2M
    Report details

    What the source says: Safety Improvement Projects: Hazard Elimination & Safety: from 0.25 mi W of CR 294 to FM 3496: (est. $2.2M)

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectFM 372 safety work, FM 902 to 0.25 mile west of CR 294Hazard removal. Estimate $3.8M
    Report details

    What the source says: Safety Improvement Projects: Hazard Elimination & Safety: from FM 902 to 0.25 mi W of CR 294: (est. $3.8M)

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectFM 51 sidewalks, I-35 southbound frontage road to FM 1306Sidewalks and curb ramps. Estimate $1.8M
    Report details

    What the source says: Pedestrian, Sidewalks & Curb Ramps : Construct Pedestrian Infrastructure: from IH 35 southbound frontage road to FM 1306: (est. $1.8M)

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectUS 82 safety work, CR 147 to 0.1 mile east of FM 678Hazard removal
    Report details

    What the source says: Safety Improvement Projects: Hazard Elimination & Safety: from CR 147 to 0.1 miles east of FM 678

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source
  • TxDOT projectUS 82 safety work, Montague County line to 0.65 mile west of FM 373Hazard removal. Estimate $1.1M
    Report details

    What the source says: Safety Improvement Projects: Hazard Elimination & Safety: from Montague County Line to 0.65 mi W of FM 373: (est. $1.1M)

    Source: TxDOT project tracker. Project updated Oct 9, 1:00 PM.

    Source

Chapter 3 of 3

Cooke County burn ban

Cooke County: no active ban reported.
County details
  • Cooke: no active ban reported
    No ban recorded

    No Cooke County burn ban recorded

    Cooke check: Oct 9, 6:07 PM

    Check weather conditions and permit requirements before burning. Sheriff: 940-665-3471, option 4.

    Montague and Wise have a burn ban recorded. Denton and Grayson have no ban recorded.

    Burn-ban details